Sublease Scenario

In this example two sublease scenarios are being compared:

  • Sublease the space now for $20/sf with 4 months of free rent or
  • Wait 5 months and sublease it at $21.50/sf with only 2 months of free rent

The first reports show the analysis for subleasing at $20/sf and the second set of reports show the comparison between subleasing at $20/sf and waiting 5 months to achieve a higher rental rate of $21.50/sf.

In this particular case, after the scenarios were compared (see Mgmt Summary & Annual Totals), the difference was calculated using LseMod's Calculate Totals command. Dynamically linked - if a change is made to one property - the Management Summary is automatically updated.

In our experience, in subleasing the key economics are cost recovery in pure dollars and the amount of money returned based on our cost, e.g. getting back $.30 on a dollar of cost. These metrics are shown on the Financial Summary for each scenario.

Additionally, LseMod provides you the option of including additional costs, or income in your analysis, such as furniture rental.

 

The reports shown are just a sample of the reports available. Additional reports can be seen by downloading a sample report or by scheduling a demo over the Internet (web demo), you can even drive!

  • Need to compare costs for leasing alternatives?
  • Frustratated when deals change? Our Management Summary below is automatically updated for changes!
  • Compare up to 100 alternatives OR evaluate scenarios.

Order now, schedule an Internet demo, download reports, or view prices.

 

 

Home  |  Products  |  Why Buy?  |  Clients  |  Downloads  |  Ordering  |  Support  |  Company

 

Lease Cost Solutions® Inc.
150 West Iowa Ave., Suite 102
Sunnyvale, CA 94086
www.LseMod.com
sales@LseMod.com
Tel: 408.253.4067
Toll Free: 1.866.757.3663
Fax: 408.253.4147

© Copyright 1996 - 2008 Lease Cost Solutions Inc. All Rights Reserved.